Office Building Holbeinstrasse

Zurich
Photo © Reinhard Zimmermann
Photo © Reinhard Zimmermann
Photo © Reinhard Zimmermann
Photo © Reinhard Zimmermann
Photo © Reinhard Zimmermann
Architects
Stücheli Architekten
Location
Holbeinstrasse 22/30, 8008 Zurich
Year
2010

Two properties in Zurich's Seefeldquartier from 1961 and 1973 were repaired, converted and connected to form a new, efficient office building. Holbeinstrasse 30 was originally an office and business building, whereas number 22 had a purely commercial purpose. This meant that they had different floor heights, load-bearing structures and access systems. Meeting the specifications for access and earthquake safety meant retaining the concrete skeleton. This required an additional evacuation route and improved reinforcement for the buildings. The decision was made to replace the core of Holbeinstrasse 30 and install a new emergency staircase, which would also secure the long-term flexibility of the space distribution. This also made it possible to redesign the staircase and sanitary facilities, as well as efficiently arranging the shaft spaces for the building services. The same measures were also taken in Holbeinstrasse 22. From the outside, both buildings appear similar, owing to the radical conversions that were carried out simultaneously. The quality of the new façade can be seen in the way the different window formats differentiate the buildings. The smallest window format measures 0.6 x 2 m and the largest 3 x 4 m, with identical construction. What appears as a punctuated façade is, in fact, designed as a pre-fabricated element façade. The existing façade material found at Holbeinstrasse 22, a mixture of different-coloured stoneware mosaics, was used as a motif and was reinterpreted. Thermally separated aluminium profiles house the suspended glass panels and rear-ventilated, smooth, glass mosaic strips. Sun protection is provided in the form of delicate exterior blinds fitted in a protected intermediate space in the window design. Thanks to the use of heat exchangers, the rooms are cooled and heated using only water from the lake. The new building meets the Minergie standard.

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by Stücheli Architekten

Student Housing ETH Zurich
Zurich
Ambassador House
Opfikon-Glattbrugg
Zurich Technical College
Zurich
Schulraumprovisorium Campus Irchel
Zürich
Europaallee Construction Plot B
Zürich