Freitag Factory Maag

Zurich
建築家
spillmann echsle architekten
2003

The production of FREITAG bags requires a great deal of space. Approximately 2’780 square meters of floor area are needed in order to have the used truck tarps delivered, pulled apart, cut to the rough shape, washed, rolled, tailored, assorted, assembled, sewn together to bags and other items, photographed, stored, packed, stored again and, finally, shipped off. Additional space is taken up by small exhibitions, secondary rooms for the staff and, most of all, for office space.

The built-in office space is in a raised position within the wide-span production hall and offers space for forty workplaces. Out of functional reasons it leans against the old industrial façade. The workplaces for cutting and assembling the tarps are located directly under this new office space. V-shaped props carry the monolithic floor slab. In just a very short time the pre-fabricated, timber constructed walls and ceiling elements were joined together.

On the outside the boxes are clad in roofing paper, plastic cupolas cover the openings. The inside of the boxes presents itself as a warm universe made of PAVATEX.

関連したプロジェクト

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressiver Reinraumausbau
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Magazine

spillmann echsle architekten によるその他のプロジェクト

Halle 550, Zurich-Oerlikon
Apartement House Birchsteg
Zurich
Freitag Shops Worldwide
Freitag Flagship Store
Zurich
On Labs
Zürich