City Hall and Conversion Marienplatz
Bad Aibling, ドイツ
- 場所
- Marienplatz 1, 83043 Bad Aibling, ドイツ
- 年
- 2012
In the center of the Bavarian town of Bad Aibling lies Marienplatz, a historic plaza flanked by public, retail and hotel buildings. It is here that the two main streets of the town intersect and where the existing Town Hall from the 1970s has stood. In recent years, the town of Bad Aibling decided to construct a new Town Hall as a means by which to further invigorate the center.
The old town hall was demolished down to the cellar level. Keeping the cellar and the building foundations intact was part of the client’s brief for the project, and therefore a key constraint in planning. The new building has been erected on the foundations of the existing Hall, respecting the pre-determined load-bearing capacity of the cellar and foundations as well as the existing supply network. The planning team chose a lightweight construction for this reason, construction that consisted of a concrete skeletal structure with wood-clad walls.
The new hall accommodates primarily public functions. It is designed as a multi-functional venue that houses a variety of programs – including space for citizens’ services, administrative offices, meeting rooms, as well as a public library and a registry for weddings - all under one roof. In addition, part of the project brief was to vitalize the ground floor level of the city center. This was accomplished through the integration of retail program at ground level, consisting of shops and a café. Their presence here has transformed this public space into an environment that is lively and engaging both during and after business hours. The entrance of the town hall from Marienplatz leads into an atrium that hovers above the stories. From here, visitors can circumnavigate the building and experience it as a truly public space - a flowing, communicative public thoroughfare for casual and planned encounters.
The energy concept includes the implementation of LED-lighting throughout. The cooling operates through the use of water from a nearby creek. It is used for the component activation of the ceiling, the mechanical ventilation and the convection cooling of the server rooms.
Brief
New Construction City Hall and Conversion Marienplatz
Client
Stadt Bad Aibling, Germany
Architects
Behnisch Architekten
Munich, Germany
Site supervision
Beratende Ingenieure Schaaf
Munich, Germany
Structural Engineers
PlanungsgesellschaftDittrich mbH
Munich, Germany
Lighting design
Bartenbach Lichtlabor
Innsbruck, Austria
MEP Engineering
Transplan Technik-Bauplanung GmbH
Munich, Germany
Fire protection planning
Brandschutz Consulting
Munich, Germany
Planning and construction
2009 – 2012
Gross
4,300 m² / 46,285 sq.ft
Volume
15,000m³ / 529,625 cu.ft
関連したプロジェクト
Magazine
-
Spiel mit der Topografie
5 day ago
-
Auf gute Nachbarschaft
5 day ago
-
Lebenswerte Dichte
5 day ago
-
Abschied von einer Ikone
1 week ago