City of the future: The second phase of the Technology Center Seestadt has been completed.
Photo © ATP/Kuball
Daylight collectors on the roof direct the light to the heart of the building with the help of innovative fiber optic technology.
Photo © ATP/Kuball

Technologiezentrum Seestadt (tz2)

 Back to Projects list
Location
Vienna, Austria
Year
2019
Client
Vienna Business Agency. A fund of the City of Vienna. – WA Business & Service Center GmbH
Competition
2016
Lead project manager
Hannes Achammer, Markus Lentsch
Gross floor area
8,492 m²

Seestadt Aspern is one of Europe’s largest urban development areas. Innovative building projects have been emerging here for several years. The first to be completed was “aspern IQ”, Phase 1 of Technologiezentrum Seestadt. The multiple-award-winning Plus Energy office building, which was integrally designed by ATP Vienna in 2012, has become the flagship project of the 240 hectare complex. Phase 2 continues this story: ATP won a further anonymous, EU-wide realization competition for the TZ (2009, 2016). Laid out in the shape of a fan, the urban design concept for the extension demonstrates that office buildings don’t always have to be rectangular block structures. The H-form offers free space for communication and innovation.

A basic requirement of the design was a modular, highly-flexible building structure. With its systematically structured rental areas the building combines high-quality architecture, cost-effectiveness and the required high flexibility. At the same time, the lessons learned by the facility managers of Phase 1 have been applied in a focused way to the design of the expansion.

The building is divided into multifunctional production spaces at ground floor level and offices on the upper floors. An open entrance area acts as both a central meeting place and an interface with the urban realm which lends the building its special identity.

Optically, Phase 2 is similar to “Number One” in terms of material and color but exudes an industrial atmosphere. On the ground-floor, working courtyards hint at the focus of the building: Industry 4.0. The language of industrial architecture is employed very consciously. Use is made of, for example, heavy-duty screed and fair-faced concrete while the façade is a subtle variation on the metal façade of Phase 1.

Other Projects by ATP architekten ingenieure

Fraunhofer IFAM
Bremen, Germany
G3 Shopping Resort
Gerasdorf, Austria
Handl Gastro Service
Pians, Austria
Office Building Theurl
Steinfeld, Austria
Boehringer Ingelheim Austria
Vienna, Austria