© Burkhard Walther Architekturfotografie
© IB-Miebach
© Burkhard Walther Architekturfotografie
© IB-Miebach

Timber-Granite Hybrid Bridge, Schwäbisch Gmünd DE

 Back to Projects list
Location
Uferstraße, 73525 Schwäbisch Gmünd, Germany
Year
2012
Client
Landesgartenschau Schwäbisch Gmünd 2014 GmbH
Execution
Schaffitzel Holzindustrie GmbH

Dimensions:
Length: 27,10 m
Width: 2,50 m

Structure:
Main structure consisting of a massive block laminated glulam beam with a trepped cross section and a shaped longitudinal view. Decking with granite slabs. Stainless steel railings with a handrail made of Accoya.

Object planning:
Leistungsphasen 1-5

Structure planning:
Leistungsphasen 1-3
(according to german HOAI)

In addition to the advantages in construction, the stepped shape of the main beam creates an attractive view from the underlying path. Beside the filligree railing with stainless steel posts and horizontal ropes, granit is used as the decking of a timber bridge for the first time. Integrated into the handrail made from Accoya, LED lights provide illumination of the bridge. The combination of natural materials, such as timber and natural stone, form a meaningful and attractive construction.

Other Projects by Ingenieurbüro Miebach

timber roof structure Assen Station
Assen, Netherlands
Cable Stayed Bridge Aggerbogen, Lohmar DE
Lohmar, Germany
Wide Span Girder Bridge, Neckartenzlingen DE
Neckartenzlingen, Germany
Timber-Concrete Composite Bridge, Lohmar DE
Lohmar, Germany
Rheinsteg in Rheinfelden DE CH, Suspension Bridge with Timber Structure
Rheinfelden