Campus Arc 1 Neuchâtel
Back to Projects list- Year
- 2009
Ort
Neuenburg
Auftraggeber
Kanton Neuenburg
Teilleistungen
Machbarkeitsstudie, Projektierung, Realisierung
Kosten BKP 0-9
CHF 50 Mio
Raumprogramm
Konservatorium für Musik / Hochschule für Management, unterirdisches Parking
Realisierung
2004 - 2009
This educational building, which includes two institutions dedicated to education, is made up of three main elements: a four-level backbone, punctuated by double height transparent openings, and volumes cross-cutting the backbone. The building establishes a boundary with the railway field. Its presence structures the site and protects the central square of the neighborhood.